Showing posts with label Traffic Management. Show all posts
Showing posts with label Traffic Management. Show all posts

Monday, September 14, 2015

Council Turnaround. Cr Ken Ong and Stephen Mayne threaten to remove residential parkling entitlements

The City of Melbourne in a surprised turnaround has ignored residents concerns and opposition to the establishment of an Early Childhood Learning Centre located in o0ne o0f South Yarras most historic iconic buildings, and in the process Crs Ken Ong and Stephen Mayne threatened to withdraw residential parking permits.  

Opposed to Residents Concerns
LM_Robert_Doyle Robert Doyle Cr_Ken_Ong Ken Ken Ong Cr_Stephen_Mayne Stephen Mayne
DLM_Susan_Riley
 Susan Riley

[Cr_Kevin_Louey
Kevin Louey
[Cr_Oke
Cathy Oake
Cr_Leppert
Rohan Leppert
   
Support for Residents
Cr_Richard_Foster Richard Foster Cr_Beverley_Pinder_Mortimer Beverley Pinder-Mortimer Cr_Jackie_Watts Jackie Watts
​​
 For the last two years the City Council engineers and planners have opposed the establishment of an early-learning centre, on the Corner of Toorak Road West and Leopold Street South Yarra, supporting residents concerns in relation to traffic management, parking, Safety and heritage.

Last weeks decision to support the development has come as a surprise given that very little has changed to address the problems foreseen with the proposed development with no net gain to the amenity of the area.

Goodrest is one of South Yarra's most prized heritage assets, located within a residential neighbourhood zone the proposed construction of a 28 underground car-park with the car park entrance off Toorak road, demolition of residential apartments at the rear and the construction of a new Commercial building in its place.

Only Two Councillors (Cr Beverly Pinder-Mortimer and Cr Kevin Louey) met with residents on site. Both indicated at the time they would be opposed to the granting of a planning permit.

Cr Louey later voted with the Lord Mayor to approve the development whilst Cr Pinder-Mortimer, who lives in the area, maintained her position and concerns over safety and planning. Cr Richard Foster spoke passionately in opposition to the granting of a permit and Cr Jackie Watts (who did not attend the meeting on September 1) has also privately indicated that she was opposed to the development.

The level of dissatisfaction with the City Council is growing, with some residents calling for a review of the City of Melbourne;s external boundaries.  The City Council is focused on the CDB, Kensington and North Melbourne,  Melbourne two Green Councillors sided with the Lord Mayor in supporting the non-conforming development

Listen to / download audio of the September 1 meeting:

Future Melbourne Committee meeting 1 September 2015 (MP3 50MB)  

Friday, June 13, 2014

SMIDNSY. The need for a more comprehensive City road strategy plan.

Melbourne's motorcycle safety advocates has been slow in seeking reform and a better safer road environment. One of the best advocates for motorcyclist and Scooter riders is Steve Bardsley. Whilst the City of Melbourne had promised to develop a rad safety strategy plan and consider motorcyclist/scooter riders when considering traffic management it has failed to date to deliver on its undertaking  The City must stop wasting money and resources on Copenhagen style bike lanes and develop a more cost and safety effective alternative design such as the Clarendon Street, East Melbourne solution and utilizing smaller alternative bike paths.  Bicycle lanes in the inner city along major routes should be shared with motorcyclists and scooter riders.

 

Tuesday, April 22, 2014

Q-Vic Market land grab on the rise

The proposal for the redevelopment of the Queen Victoria Market site released today is more or less the same as before. No alteration.

Whilst the Council claims it is undertaking community consultation the fact is they are pushing ahead with their preferred option, funded by a developer land grab

The proposed hiving off of land and the extension of Franklin Street is huge mistake and short term thinking. They just wasted 3 million dollars destroying La Trobe street now they want to redirect that traffic past the market's southern edge, along Franklin Street and past the City Baths causing a major traffic problem at the intersection of Franklin and Victoria Streets. (The area of Franklin Street, between Swanston Street and Victoria Street, should be closed off and handed over to RMIT to develop as outdoor urban community space.)

The reduction in available land on the southern side of the market is also a lost opportunity.  This site could accommodate low-rise lane shopping development and a stepped roof-top outdoor plaza with coffee shops and community entertainment spaces and an underground car park that would enhance the market precinct and allow for staged development.
 
The development of a high rise tower block on the southern end will loom over the market and limit its potential as a real vibrant community space,

If they need Money for the project than ask the State Government to payback the $50 Million that Jeff Kennett acquired from the Council  for the Federation Square project,  the value of which no longer appears on the council assets register.


Saturday, August 10, 2013

Melbourne's Bike Plan Roll-out in need of review

300m is not going to address issues related with Car Dooring.  The so called "Copenhagen" style bike lanes are not the solution. They will only add to risk of commuter safety. A better and mare prudent cost saving option would have been to install wider open  Chevron line delineated bike paths. For the cost of 300m Melbourne could have upgraded and installed 4Km of bike path in St Kilda Road travelling down both sides.  The City of Melbourne's rejection of a one month delay and a review of the Latrobe Street and Princes Bridge lanes closures is a step backwards.



Latrobe Street is a mistake and remains a risk to both driver and cyclist safety. Swanston Street and Albert Street lanes are also in need of review

An important aspect of any road design is the ability to read the road ahead and gauge the level of traffic management and design that applies.

The installation of wider Chevron line delineated lanes would have been consistent with the design of the Princes Bridge bike lane and  other more successful bike paths such as the one installed in Clardeon Street East Melbourne
 
Instead of Latrobe Street the City of Melbourne should have investigated installing bike lanes in alternative less used smaller side streets such as Abbeckett Street or Franklin Street

As to Princes Bridge I have no objection to the lane closure provided the City of Melbourne provides an alternative traffic river crossing to the East of Princess Bride. 

Swan Street Bridge is already congestion servicing West-East bound traffic.

A new bridge connecting Linlithgow to Batman Avenue Toll way would be in order to allow a further reduction in traffic flow on Swantson Street-St Kilda Road Between Flinders Street and Linlithgow Street.

There were a number of flaws in the Council's consultation process not the least of its failure to properly consider alternative cheaper and more effective designs that address the safety concerns of cyclists and dooring.  Council consulted widely with Cyclist groups but ignored the broader communities concerns in pushing ahead with the design solution adopted including the safety concerns of disabled drivers and passengers.

The segregated lanes in Albert Street, Swanston Street North and recently installed in Latrobe Street are a disaster in design and implementation.  They would have been better had they adopted the alternative chevron design. The money save alone would have allowed the upgrading of a significant number of bike paths within the city not just 300m in St Kilda Road.

A pause for a review to allow assessment of the Princes Bridge and Latrobe Street developments would have been prudent,  responsible and would have allowed for a better roll-out of a safer greater bike plan that is embraced by the whole community as opposed to one that had divided and created hostility towards cyclists.

This is not a way forward but a regressive step to the side

Friday, August 09, 2013

Melbourne's Bicycle Network Wreck: A tangled web of bad decisions, designs and implementation


Those who do not learn from the mistakes of the past are doom to repeat them

The City of Melbourne's refusal to subject Melbourne Bicycle Lanes to review has only compounded problems and undermine public confidence.

The Lord Mayor Robert Doyle and others who claim that the various segments of Melbourne's bike strategy are separate and as such not related does not wash.

"Latrobe Street does not relate to Swanston Street which is separate from Princes Bridge and that St Kilda Road is also a separate issue to both"
Robert Doyle said that Latrobe Street could not be part of a review because it was in place.  Stephen Mayne said he would support a review if it included Latrobe Street.  

The logic that the proposed review did not include Latrobe Street or that Princes Bridge is not related to the St Kilda Road bike path astounds logic.  Of course they are related, they form part of a network of bike paths in the same way that various Streets , Lanes and Roads, trains trams etc form part of the City road/transport network. They are explicitly related and all directly impact and effect each other. They can not be separated and should have been included in a ongoing review of Council's transport strategy plan.

There has failed to undertake progressive strategic pubic review of the roll out of its ill-considered Transport plan. The consultation process undertaken was flawed in its implementation. Like the magician or trickster that asks a serious of questions and then shows you the answer written down on a hidden piece of paper.

We already know that the process and management of the consultation was flawed.  Most stakeholders we contacted have said they did not think they were consulted, instead they were just informed and told what was going to happen and their main concerns were ignored. 

A major part of any effective consultation and design project is the review process. The ability to stop and review a project at various stages of the project, each aspect and segment.  The City of Melbourne has failed on all accounts and most can be attributed to the administration of the process , the role of the responsible chairperson and lack of review.

It all depends, of course, on what your goal is. If you have a set idea and you goal is to bring that idea into existence no matter what the cost then all kinds of mistakes will inevitably be made.

There are a number major problems and issues identified with  Melbourne's Bicycle Network planning, each one in turn has an impacted on the other and every segment and aspect of the overall design ..



Disclaimer and warning

First it needs to be stated that a good designed bicycle network should make a positive contribution to the transport mix to any city. It must seek to address all stakeholders concerns and not favour any one interest group above the interests of another. So before anyone goes on and seeks to engaged in personal abuse and vilification lets be clear Bicycle Paths are good and should be encouraged.

Those that engage in such personal abuse and attacks are not helping to serve their cause. Writing abusive emails or making threats or acts of intimidation might make you feel good at a football match but that is all. Please note that all abusive comments are logged and recorded.

Having stated that there are a number of issues and principles that need to be established to assist in planning the network.

Major roads should be avoided 

Where possible a bike path should seek to use less congested roads and streets. Canning Street, Carlton, is a good example of a inner city bike path that works.   It is a local street that carries minimal traffic and is ideal for cycling. This is evident by the fact that it is Melbourne's most popular bicycle commuter route.

Lane separation

The so called "Copenhagen Bicycle Lane" separation design should be avoided and only adopted as a last resort. To date they have not worked in Melbourne.  Melbourne unlike Copenhagen has wider streets and different overall traffic patterns.
 
Consideration should be given, in the first instance, to installing a chevron line marking bike lanes,  The bike lane on Claredon Street, East Melbourne, should have been considered as a preferred option before adopting a "Copenhagen Bicycle Lane" closed separation option. 

The Claredon Street Bicycle Lane design addresses cyclists main concern for safety related to lane separation and risk of "dooring". (Accidents that occur of inattentive drivers and passengers of parked vehicles opening car doors in the path of an oncoming cyclist). The Claredon Street design includes chevron line markings and wider bicycle paths that allow a cyclist to travel away outside the danger zone.

Not only are chevron segmented lanes safer they are also cheaper and as such allow for construct "more bike path for our buck". The Claredon Street design solution was recommend by Melbourne's Senior Traffic Engineers but was excluded from consideration by management and Cathy Oake, Chairman of the Council's Transport portfolio.

Financial resources are limited and any design should have be subject to a  cost benefit analysis.

The closed "Copenhagen style" bike lanes that have a physical separation barrier are ten times more expensive to construct the the Claredon Street option ., Closed lanes create congestion, restict use of the road space by other users, including emergency access, and generate additional safety issues concerns with other road users.

For the price of the 350m St Kilda Road physical lane separation proposal we could install 4Km of chevron bike lane and even more bike lanes could have been upgraded for $2.6 Million spent on Latrobe Street, making it much better and safer overall for cyclists and commuters alike.

The chevron lane separation design is overall a better choice. An option that the City of Melbourne failed to give due and proper consideration.

Public Safety

There are serious issues related to the safety of disabled commuters, taxi and bus passengers with the "Copenhagen closed lane" design.  Drivers and passenger alighting from vehicles parked next to a 21 metre physical concrete barrier have to remain balanced on the separation barrier and extra take care in crossing the neighbouring bike path  to get access to the adjacent footpath. A dangerous situation that discriminates against disabled computers the most.  Unloading from taxis and buses is almost impossible. Try unloading a bus load of 20 or more passengers onto a small narrow concrete strip away from the footpath as will be the case in St Kilda Road.

Whilst bicyclists may be safe from dooring, motorist now run the risk of opening doors in the path of passing traffic. Issues the council had failed to mention in its report.

The other solution is to withdraw On-Street parking adjacent to closed bike lanes but that would result in a loss of Council revenue.

Latrobe Street

Costing $2.6Million the Latrobe Street bike path that has just recently been installed has already proven to be a disaster. It's design, location and implementation is wrong, safety issues not properly considered and a nightmare in terms of urban design, heritage, cleaning and storm water drainage.

The problems with Latrobe Street are considerable and should have been identified earlier in the design stage of the development and should have been subjected to a review process now it is in place.

The fact that these issues were overlooked raises serious questions in relation to the management and professional standing of the City of Melbourne engineering services. (Most likely a managerial problem)

The failure and refusal of the City Council to undertake a comprehensive review of previous bike lanes on Albert Street and the Northern section of Swanston Street should have alerted the City council of the problems that Latrobe Street is facing. Senior Engineers who did express these concerns were ignored or overridden by management

Apart from the design issue the other significant problem with Latrobe Street is the choice of transit route. Latrobe Street should never have been chosen.

The City Council should have developed Abbecket Street or Franklin Street as an alternative bike path option.

Latrobe Street is proving to a big embarrassment to the City Council and this is the main reason why the Lord Mayor and management were opposed the motion put forward by Councillors Richard Foster and Jackie Watts. It would have been prudent and responsible for the City Council to pause for one month and engaged the community by holding a mid project public review before proceeding to make the same mistakes in St Kilda Road.

The City Council knows it is facing a major problem and is desperate to try and keep the lid on it all in a futile effort to avoid it boiling over or erupting adding to the  inevitable in a total loss of confidence in the Council's engineering services. After all they Council approved the project and spent $2.6 Million creating the problem on Latrobe Street. 

Avoiding an open public review or attacking those that advocate a review and rethink is not going to make the problem go away.

Like the Collins Class submarine patching up the project to try and make it work is a be a big ask also. Piecemeal band-aid solutions to a problem that should not have been created in the first place.

The City Council, as part of its consultation process told stakeholders that there would be no loss of amenity or parking. 

Already Council has had to consider removing on-street parking. There are numerous issues related to the design of crossroad intersections and driveway access that place both cyclist and motorists safety at risk. In short the management and design of the project has little to desire, it's far from the success the Councillors claimed it was. 

Princes Bridge

Princes Bridge is a work in progress. Already the promises made by the Lord Mayor, Robert Doyle,  have proven to be false.  Travel time across the bridge is twice as long then prior to the south bound lane closure. the number of cars transiting from Swanston Street into Flinders Street is 2 to 25% less then before. 

Councillor Stephen Mayne reported that Council has estimated that there has been a 12% reduction in traffic throughput out of Swanston Street (this does not correspond with  independent surveys. Prior to the lane closure there were 20-22 cars per light cycle. Currently only 14-16 Cars are exiting into Flinders Street per light cycle) The reduction in throughput and performance could be address to some extent by tweaking the light signaling, something that the Lord Mayor said the Council would do but to date have not changed.  It has been suggested that the Council Engineers had planned to cause congestion and by doing so aimed to reduce the number of motorists using the bridge.

Robert Doyle said that Princess Bridge Lane closure was a trial but no one seriously considered this as anything other misdirection.

Alternative access

Most of the North bound traffic crossing Princes Bridge turns right into Flinders Street and then turns again either at Russell or Exhibition Street.

It would be desirable if Princess Bridge was closed to all non essential vehicular traffic.
The freeing of Princes Bridge from vehicular traffic would allow for better public transport interchange services but this can only be done if there was an alternative river crossing East of Princes Bridge.

The Swan Street Bridge is not suitable and is already suffering severe congestion by traffic transiting in a West East direction.

The  other option is for the construction of a second bridge bridge connecting  Linithgow and Batman Avenue providing a North-South traffic alternative.

Flinders Street

Next on the Council's agenda is the South bound lane on Princes Bridge,  

In order to construct a south bound bike lane the City of Melbourne in association with Vicroads needs to reduce the volume of traffic and the number of lanes using Flinders Street and tuning left into Swanston Street. Most of the cars on Flinders street are exiting the Eastern end of the City and travelling South.   Flinders Street West of Swanston Street.is already restricted to one lane traffic . 

The construction of an alternative river crossing off Batman  Avenue joining Linlithgow Avenue on the South side would ease traffic demand on Flinders/Swantson Street South on to St Kilda Road.

The Council's solution is to remove a lane of traffic which will generate congestion which in turn will reduce the number of cars through displacement.

Road Safety and Consultation

One major criticism of the Council's consultation process was the failure of the City Council to publish all the submissions received. Instead the council  published an edited summary provided by the administration. The failure and refusal of the city council to publish the submission has added to the mistrust and  loss of confidence overall in the consultation process.

Most of the "consultation" that did  take place was in the form of information of what was already decided. There was little to no consideration of variable alternatives.  Many of the stakeholders contacted said they did not think the City Council listened or considered their opinions or concerns. They were just heard out or sent information so the Council could claim it had consulted widely.  

A major part of the consultation undertaken was with the members of the bicycle lobby meeting on coffee shops and various venues, this was disproportionate to other road users.

Earlier on in May that the Council's "Pedestrian, Bicyclist and Motorcyclist safety plan had to be deferred as Motorcyclist and Scooter Riders were not consulted in the first draft presented to Council. Motorcyclists and scooter riders face the same problems as cyclists in terms of safety and they rightly felt their concerns were not being addressed and in many cases the priority given to cyclists was compounding problems related to their safety
 
Council Engineering Services Department also overlooked a number of other significant stakeholders in the consultation process.  Missing from the list of was Ambulance Victoria and the Metropolitan Fire-brigade who were not listed on the road safety plan .

There is ongoing concern that the various bike paths, tram stops and lane reduction has compromised Melbourne's emergency response capability.

St Kilda Road "Copenhagen lanes" will also impact on  emergency services response times between the Alfred Hospital and the City.

There is a recognized urgent need for a series of "Emergency stress testing" to ascertain the preparedness of the City to cope with an emergency or possible terrorist attack. We can not afford to ignore or put off this issue much longer. The sooner it is addressed and a comprehensive stress plan is implemented the sooner we can identify problems and restore confidence in the cities preparedness to copy with an emergency.

Major Stake holders sidelined

Organization such as Vicroads, the RACV, Bus proprietors, Street Traders, Emergency Services, the State Disability Advocate and the Taxi industry have all had their concerns down graded or discarded.  Details and copies of their submissions have not been made been published on the Council's web site.

War in Cars: Engineering Congestion

Instead of managing traffic the City Council is engaged in a war on cars by "Engineering Congestion" in the belief that Cars will bypass the city. This will ave a flow on effect and impact on small business retailers who fear losing customers to the suburban shopping centres. Retailers are already suffering from the city's high cost of car parking.
  
City Council will do anything to avoid criticism or accountability

Last Tuesdays refusal to engage the community on public debate and undertake a review, before pushing ahead with designs that are proven to not work provides little hope or confidence that the Council is prepared to address important issues, other than placing  the perceived needs of cyclists ahead of all other road users and stakeholders.

No satisfactory explanation has been given for not alternative solutions that are better, cheaper and more effective. 

Welcome to Melbourne "Bike obsessed" City Council. A Council that will go to any length to limit to prevent any rethink or review of its Transport plan

Greens Councillor, Cathy Oake, is chairman of the council's transport portfolio

Monday, June 03, 2013

The way things are going, Doyle may as well ban cars altogether. - Bruce Guthrie Sunday Age


Illustration: Matt Davidson. Illustration: Matt Davidson. 
Source The  Sunday Age - June 2 2013


Honestly, why doesn't Robert Doyle erect barricades, put up signs and establish checkpoints around the city to reinforce the obvious? If you're not on two legs, two wheels or public transport, Melbourne doesn't want you any more. Our city no longer likes motorists or their cars and it would be better for everyone if the lord mayor just came out and said it.

He came close last year, when he wrote in the foreword to the Transport Plan for Melbourne: ''We are a walking and cycling city, and council provides infrastructure to improve the safety and convenience of cyclists and pedestrians.''

I'll try to remember that when next I'm forced to drive into town because the weather's foul or the train or tram systems fail me. Which is pretty often.

The latest salvo against drivers came last week when the council announced it would reduce northbound traffic lanes from two to one on the western side of Princes Bridge to make way for ''a wide green bicycle lane''. 
 
It's supposed to be a three-month trial, with roadworks beginning in June, but I'll bet the lord mayoral Lycra that we will never get that second lane back. (Yes, he wears it on his bike rides; sorry for that image.)
 
The council says the switch should improve safety by ''moving cyclists from the footpath, which is often crowded, onto their own larger, dedicated lane on the road''.
 
In a tortured attempt at minimising anger and frustration among motorists forced to queue even longer on St Kilda Road approaches, Doyle said it would affect only 22 cars. Strictly speaking, that's probably true at any given time. But it will be happening over and over again, a fact the lord mayor did not acknowledge.
 
Neither did the council press release, which said disingenuously: ''There will be no significant impact to travel times and, while queues will be longer, the same number of vehicles will be able to pass through the [Flinders Street] intersection.'' Really? I suspect it will take less time to crawl across the bridge on hands and knees than it will be to drive.
 
I have no argument with separating cyclists and pedestrians, but I'm not sure it should be at the expense of motorists. Besides, a two-wheeled Fast & Furious plays out every night on the footpaths immediately below Princes Bridge's south side, and nothing is done about that.
 
Anyone who has walked along Yarra Promenade by Crown Casino or Southbank Promenade's restaurant strip during the evening peak knows they are at risk from commuting cyclists. The speed limit for bicycles there is supposed to be 10km/h, but few take notice of it. A drugged-up Lance Armstrong would have trouble keeping up with some of them.
 
Indeed, when I was editing the Herald Sun five years ago, we hired a speed-gun expert to monitor bicycle traffic on the promenades and found that many cyclists were travelling at twice the speed limit and, in some cases, more. A recent walk there indicated nothing's changed.
 
The council has done little or nothing to deal with that - maybe it's because while they are happy to put limits on drivers, they are disinclined to upset the cycling lobby.
 
The RACV was quick to condemn the council's Princes Bridge plan, calling it ''yet another solution on the cheap'' that would do little to improve congestion or safety. Their roads and traffic manager, Dave Jones, said it proved the council had learnt nothing from the problems it created through ill-considered changes to La Trobe Street traffic flows. He might have also cited changes to Albert Street on the eastern fringe of the city, where similar ''Copenhagen-style'' bicycle lanes - wedged between parked cars and the footpath - continue to delay and confound motorists and their passengers, who have to dodge cyclists when they alight from vehicles.
 
The pain for motorists does not end there: on-street parking fees are about to jump almost 40 per cent to $5.50 an hour, while rates in council car parks can be double that. (Our private car parks are already among the most expensive in the world.) All in the name of a glossy Transport Plan. Forgive my scepticism, but it sounds like nothing more than a grab for cash under the guise of greening the place. The council is not the first enterprise to do that.
 
This undeclared war on motorists can't eliminate cars entirely, though. If that was truly the goal, the council would get rid of on-street parking and turn the space over to pedestrians and cyclists, without penalising moving traffic. But it needs the revenue from parking meters, not to mention fines: it expects to collect $40 million in infringements in the next financial year, aided by those insidious sensors the Doyle administration has been installing in spaces across the city. They mean you can be ticketed even though your meter might show minutes remaining.
 
It's no wonder people are taking their business elsewhere. 
 
Bruce Guthrie is a former editor of The Age and The Sunday Age.

Saturday, April 27, 2013

Swanston Street: Open it to traffic 7pm to 7am Left turn in Left turn out.

Melbourne's failed Swanston Street should be open to circulating traffic 7 AM to 7 PM with consideration also be given to opening it up on the weekend.

Swanston Street has been a complete disaster.   100's of Millons of dollars, super stops and bike paths and the Street still does not work. Killed off by Engineering Services and a City Council hell bent on catering for Bicycles.  Bicycles mainly use Swanston street in the peak monring and afternoon period.  After 7PM it is dead.  If it was not for Street Traders and buskers the Street would be worst than it is.

Opening up Swanston Street for circulating traffic from Flinders Lane, Little Collins Street and Little Lonsdale Street, Left Hand turn in Left hand turn out 7PM to 7AM would dd life and vitality back into the City precinct

Sunday, April 14, 2013

Engineering Melbourne: Incompetence or careless oversight?

The City of Melbourne Traffic Engineers NEVER cease to amaze.


A brand new Domain Interchange in St Kilda Road.

New facilities and New Traffic Lights. Looks impressive and costs millions and the execution of the constriction works was impressive.  (Clearly the City of Melbourne were not coordinating the construction phase).


Cars exiting Park Street tuning right into St Kilda Road left in the dark as to the state of the traffic light once they cross the center road divide..

PROBLEM:  Whoever designed the traffic lights signaling just reinstated what was there.  They added a warning sign "Watch for Pedestrians"  HOWEVER traffic exiting Park Street and crossing St Kilda Road then turning right are left in the dark. Some "not so bright traffic engineer" or site design manager failed to install a right tuning arrow on the SE corner of this busy intersection.  A simple yet very useful design change. One extra light showing a turn right arrow is all that's required to improve traffic flow and safety

What makes it worst is that the City of Melbourne had been informed and had received complaints about the traffic signals at this site and they have still failed to get it right.  I have complained about this site for years and I tthought (Wrongfully as it tuns out) that they will address this design flaw in the new Domain Interchange construction. . Haig Poulson, City Traffic Engineer Manager, was informed of this problem, but he obviously failed to note it or act on it. Too many coffees, too much money and no common sense.

This is an accident waiting to happen, It's just a matter of traffic light timing, a moments hesitation, a car taking off traveling south. The absence of a right arrow signal that an City Engineer failed to install.

Saturday, April 13, 2013

Road Safety: Consultation Vespas into Thin Air

The Victorian Scooters Riders Association (VSRA), An umbrella group representing four largest Victorian Scooter clubs, claim that their concerns on road safety have not been given due consideration. They have also expressed concern that other Motorcycle safety organizations have not been included in the City of Melbourne Road Safety Plan to be considered by the City Council on Tuesday, April 16. The report sets the basis of Council traffic management project funding for the next four years.

Australians are being encouraged to jump on a motorcycle or scooter
as a way of tackling congestion within the country’s major cities.
- Econews.com.au
The City Council claim to have consulted with the Motorcycle Riders Association (MRA) a claim denied by  MRA president,  The MRA is a social club only and do not provide advocacy support on Road Safety issues., They leave this up to the Victorian Motorcycle Council and the Independent Riders' Association.  Neither are listed in the City Council's report

Stephen Bardsley, spokesperson for the VSRA, in his newsletter to member associations has expressed his concern that a number of issues raised with the City Council has been ignored or played down in the report to Council.

The Melbourne City Council will vote on the Plan this coming Tuesday and as far as I can see the final Report is a disgrace, the opinions of Motorcycle and Scooter Riders have been ignored and the final Report is anti Motorcycle and Scooter Riders at the expense of being totally pro Pedestrian and Pedal Cyclists. 
What is of great concern to me is that the Report states that the VSRA were consulted and this could be seen as our endorsement of the Plan - Stephen Bardsley
The Victorian Motorcycle and Scooter Riding Groups are unanimous in opposing the plan

In October  2012 the VSRA commented


The report seems to be preparing all and sundry it should be expected that Motorcycle / Scooter Parking on the pavement will no longer be allowed, this really would be a backward step and a short sighted approach, in particular considering the Report acknowledges and includes statements such as:

 “There is a lack of attention to the needs of motorcyclists in the design of street environments”.
and“There is a general lack of appropriate parking for motorcycles in the CBD”

The report on road safety has not considered a number of issues concerning motorcycles and scooter riders.  They have included bus lane sharing only but as a low priority.  No consideration has been given to issues such as Lane Filtering, Shared use of underutilized bike lanes, improved traffic management to ease congestion. Turn left at anytime with care options or alternative routes for bicycle paths that do not impact on major transit routes. And slippery line road markings. It would appear that motorcycles concerns have been ignored or not taken seriously.  An excuse to be seen to be consulting.

Motorcycle/scooter riders were not consulted when the City Council undertook its consultation process on the City's Bike paths.

VSRA Policy documents

Media Press Releases (Link)